| Notification No. G.S.R. 573(E) dated 01-07-2026 |
The Chief Inspector-cum The Facilitator of Mines designated as the Director General of Mines Safety specifies the procedure for testing of breathing apparatus, flow meter and purity of oxygen for use in breathing apparatus under sub rule 131(5) of OSH&WC (Central) Rules , 2026 |